video corpo
Add to favorites

#Product Trends

New Docks at the 2016 Progressive Insurance Miami International Boat Show Bear the Name of Bellingham Marine

Miami, Florida, USA – September 23, 2015 – Bellingham Marine, world renowned dock designer and

marina builder, was awarded a contract by the National Marine Manufacturers Association (NMMA), to

provide over 116,000 square feet of timber docks for the 2016 Progressive Insurance Miami

International Boat Show at its new venue, Miami Marine Stadium Park and Basin, in Miami, Florida,

scheduled from February 11-15, 2016.

NMMA awarded the multimillion dollar contract to Bellingham Marine after interviewing a handful of

leading dock suppliers. According to Larry Berryman, Assistant Show Manager and Director of Sales for

NMMA’s Miami International Boat Show, “Bellingham Marine provided the most flexibility, best

innovation in the design of the dock system, and supported our desire to ensure environmentally safe

structures at the boat show’s new location. Our new Bellingham docks add to the extraordinary

experience the 2016 Miami International Boat Show will deliver to attendees and exhibitors at Miami

Marine Stadium Park & Basin.”

The Miami Boat Show docks have been custom designed to facilitate easy install, removal and storage,

and to support the needs of the boat show. Lifting eye’s, universal connection pins, flip covers on utility

trenches, four way float connections, and moveable pile guides for maximum flexibility in anchorage

placement are just a few of the one-of-a-kind features incorporated in the new docks.

The docks are also constructed from environmentally friendly materials and designed for use in sensitive

marine environments. The docks’ Army Corp-approved, fully encapsulated flotation and EPA-approved

treatment of timber ensure that no unsafe materials or chemicals enter the water.

The entire dock system is comprised of four major components that can be connected in a variety of

configurations to create unique layouts year to year, including gathering areas for crowds and food

vendors and moorage space for over 600 boats.

The docks will be delivered to the NMMA in December and will be installed at the show’s new site,

Miami Marine Stadium Park and Basin, just prior to the opening of the boat show.

“Working with clients to provide a customized solution that provides them with the greatest value is

what we do best; we’re thrilled to work with the NMMA and the Miami Boat Show team on this

significant move of the boat show to Miami Marine Stadium Park and Basin,” said Everett Babbitt,

Bellingham Marine’s President.

Details

  • Bellingham Marine

    Keywords