Add to favorites

#Industry News

Do you know marine products pre-installation at site?

Bollard and fender pre-installation

Mooring bollard and marine fender systems can be pre-installed by their holding down bolts, which are embedded into the concrete or steel structures of the quay or dock. This approach ensures proper alignment and secure anchorage before the full installation process. Once the holding down bolts are in place, the main components, such as the bollard body or fender panel, can be carefully positioned and fastened.

GLEN can prioritize the delivery of these hold-down bolts to help reduce site construction time when needed.

Proper pre-installation procedures, including accurate alignment, torque settings for bolts, and inspection of materials, are essential to maximize the durability and performance of these critical maritime infrastructure components. Regular maintenance and inspections post-installation are also crucial to extend their service life and maintain safety standards.

#PreInstallation #Bollard #FenderSystem #HoldDownBolt #GLEN

Do you know marine products pre-installation at site?

Details

  • Chongqing, China
  • GLEN ENGINEERING