Posted on 8/24/2015
Test for second of ten M170/3S for De Hoop Loobith International BV with an SWL of 15 t and a maximum outreach of 25 m. The crane is certified by LRS and will work on board of a platform supply vessel for Abu Dhabi National Oil Company. This is a long and strong cooperation the one between Sormec and De Hoop Shipyard.
The first vessel, named Esnaad 221, was delivered to Esnaad, the operating company of the ADNOC group, on the 15th of July 2015 by De Hoop Shipyard with Sormec crane M170/3S on board. In the meantime, the hull of the second vessel has been launched in Foxhol, our crane, after successful test of today, is ready to reach the Shipyard and be installed on board.